Case Study Download – Swift Resolution of a Critical Power Issue
In an urgent test of skill and speed, UIS faced a daunting challenge at a critical wastewater plant. The heart of the emergency was a 1958 oil-filled breaker, which, after a routine shutdown, refused to close. This wasn’t just a mechanical failure; it was a threat to the community, risking flooding and severe environmental consequences.